1. Home
  2. /
  3. Panel Help
  4. /
  5. Manufacturing
  6. /
  7. Pull-planning replanning report (REQ039A)

Pull-planning replanning report (REQ039A)

From this program you can order a replanning report for pull-planning controlled items. The report can be created both for backward and forward planning.

Requirement type
The code indicates what type of items should be included in the report.

Valid codes are:

Code Description
1 Shortage
2 Priority
Replanning type
The code indicates which replanning type should be printed.

Valid codes are:

Code Description
1 Backward scheduling
2 Forward scheduling
Planner
The planner the report should be selected for.
Horizon date
The horizon date for forward scheduling.