The purpose of this program is to enquire about values that are related to the product costing calculation concerning operations times and costs.
Function keys
Minutes/Decimals | Toggle between hours and minutes and hours and decimals for the operation times. |
- Item
- Cost period
- The period on the product costing. If the period is 000000, this means that it is the current product costing.
- Warehouse
- Variant
- Cost type
- The description indicates if the product costing is current, future or a simulation costing type.
- Struct quant
- Price type
- The prices used for the product costing.
- Std quant PC
- The quantity used when the product costing was performed.
- Struct unit
- Operation number
- Work centre
- Op description
- Time basis code
- The time basis code indicates in what size the operation time is entered. If this field includes information, it will override the structure quantity.
Code Description BLANK Times according to the structure quantity. 1 Times per 10 units. 2 Times per 100 units. 3 Times per 1,000 units. 4 Times per 10,000 units.
- Waste pct
- The percentage indicates how much extra time is needed for the operation due to production waste.
- Set-up time int
- Set-up time ext
- Run and labour time
- Machine time
- The machine time in hours for the operation. This time is used as a part in product costing calculation function in combination with the work centre hours costs.
- Subc price
- This field is only displayed if the DC1 Manufacturing sub-contractor functionality is activated in Work with companies. This is the sub-contract price. This value can be used in the cost model.
- Subc set-up price
- This field is only displayed if the DC1 Manufacturing sub-contractor functionality is activated in Work with companies. This is the sub-contract set-up cost. This value can be used in the cost model.
- Line amount
- The total cost for the actual operation.