Maintain formulas for actual/base values in Business Performance Director

Related topics

The calculation formulas for Actual and Base values, for the preloaded components, are predefined. See Business Performance Director calculation reference for the relevant information.

If you want to change a formula or add a formula for a new component, do as follows:

  1. Access the Edit component properties window for the applicable component.
  2. Click the Edit button for the Component formula.
  3. You access the Edit formula window for the selected component. Define the following information:
  4. Variables type
    Select from the following on which to base the formula:
    • Business information warehouse balances
    • Other components (KPI’s) that are defined in the Business Performance Director
    • Constants (entered on the main window’s input area. E.g., From/To periods)
    Balance value type
    This controls how the balances, retrieved from the Business Information Warehouse database, will be calculated. The selection you make applies to the entire formula. Pull down the list and select from the following:
    • Period results = Total values from selected periods
    • Average balance = Total values from selected periods / number of periods
    • Closing balance = Opening balance plus total value for selected periods
    Show formula
    Choose how you want the formula to be displayed in the lower portion of the window. Select from Edited or Unedited (internal code) format.

    Use the online calculator to change or create the formula:

    The calculator is a pallet of components and operations that can be used to construct the formula. Select from the list of variables and operations on the calculator to build your formula. Every time you click on a variable or operation, it will be added to your formula and displayed in the lower portion of the window. To undo the latest selection, click the red C button on the calculator. When ready, click OK to save the formula.

Related topics