1. Home
  2. /
  3. Panel Help
  4. /
  5. Manufacturing
  6. /
  7. Workload enquiry, Work centre...

Workload enquiry, Work centre day/week, Op times in decimal/minutes (PRO203C)

On this panel you can view the workload for a selected work centre. The program displays all manufacturing order operations referring to the selected work centre and selected date interval.

Options

Operation detail Select this option to view the manufacturing order operation.

Function keys

Change view Toggle between viewing Item and Operation description.
Minutes/Decimals Toggle between hours and minutes and hours and decimals for the operation times.
Work centre
The code and description that identify the work centre.

Calendar date
The selected date interval.
Capacity
The work centre capacity for the selected date interval.
Simulation version
The simulation version. This is only displayed if the active version is not selected.
Workload
The workload for the selected date interval. Refers to not closed manufacturing orders, except those with order status 00.
Workload type
Prel workload
The preliminary workload for the selected date interval. Refers to manufacturing orders with order status 00.
Restriction group
The code that identifies the workload restriction group. This is only displayed for critical resources for which a restriction group has been used for the operation/work centre planning.
Total workload
The total workload. Workload added together with preliminary workload.
Order number
Op no
Item / Op desc
Workload
The workload for not closed manufacturing orders, except those with order status 00. The operation times are related to the current mode of the Workload type field.
Prel workl
The workload for preliminary manufacturing orders (order status 00). The operation times are related to the current mode of the Workload type field.
Str time
The time when the operation is planned to be started for the selected date. This field is only displayed if the MPL-TIME (Plan operation by date/time) function is activated in the Function control file.
Cmpl time
The time when the operation is planned to be completed for the selected date. This field is only displayed if the MPL-TIME (Plan operation by date/time) function is activated in the Function control file.