Work centre capacity maintenance (BAS004O)

This program is used to override the capacity calculation parameters of the work centre.

Work centre
The code and description that identify the work centre.
Workl planning type
The type of operation time that is included in the workload, either Run/labour or Machine. The information is retrieved from the Workl planning type field in the Work centre table.
Date
The capacity date.
to date
The date indicates until when the new parameters should override the normal capacity calculation parameters.
Man factor
The number of people that the capacity is to be multiplied by to make up the nominal total capacity/day.
Number of shifts
The number of shifts that the capacity is to be multiplied by to make up the nominal total capacity/day. Note: This field is not displayed if the MPL-TIME (Plan operation by date/time) function is activated in the Function control file, since the total capacity for the day time is set-up in the day format.
Number of machines
The number of machines that the capacity is to be multiplied by to make up the nominal total capacity/day.
Resources per job
The number of resources per job. This information is used to calculate the time per day that a manufacturing order operation can be planned. If Workl planning type is set to 1 (Run/labour), enter resources up to man factor but not higher. If Workl planning type is set to 2 (Machine), enter resources up to number of machines but not higher. Note: The number of resources per job can be overridden from the item’s bill of routing. You can also change the resources per job in the manufacturing order operation.