Related topics
Follow-up actions are used for the planning and reporting of project-related activities that should not be invoiced. Performed actions are reported on the Actual follow-up maintenance panel and saved in a history file. You can therefore keep track of the planned actions and see when they have been dealt with.
This panel displays the reported follow-up actions for a specific follow-up code.
Selection fields
- Code
- The follow-up code and description. The system displays all actions with this code as planned follow-up code.
- Pl Dat
- The planned date.
- Number
- Line
- Code
- The planned and actual follow-up codes.
- Description
- The description of the planned and actual actions.
- Act date
- The actual date of the action.
- Act handl
- The actual handler that has executed the action.
- Status
- The code indicates the status of the action.
Code Description Blank Open 9 Closed