The purpose of this program is to maintain the calculated lead times before updating the Item warehouse file and the Item file.
Options
Enq sub-assembly items |
Select this option to view the calculated lead time for the sub-assemblies. Note: You can only use this option if the Lead time calc field is set to 3 (Calculate all levels/Total lead time) on the Lead time proposal creation panel. |
Function keys
Fast update |
Narrow down the system’s selection of items within the proposal for fast update. |
Selection fields
- Proposal
- The number and description of the proposal.
- Item/Description
- Whs
- Old Pr lt
- The old production lead time, i.e before the calculation.
- New Pr lt
- The new calculated production lead time. The new production lead time can be updated here or via the fast update.
- Old lt
- The old lead time that is used for sales availability check. Note: This field is only displayed if Lead time calc is set to 2 or 3 on the Lead time proposal creation panel.
- New lt
- The new calculated lead time that is used for the sales availability check. The new lead time can be updated here or via the fast update. Note: This field is only displayed if Lead time calc is set to 2 or 3 on the Lead time proposal creation panel.