1. Home
  2. /
  3. Panel Help
  4. /
  5. Manufacturing
  6. /
  7. Cumulative structure (BAS038A)

Cumulative structure (BAS038A)

The purpose of this program is to enquire on the last update of the structure enquiry. You can also rebuild the enquiry record for selected item bill of material.

Creation date
The date of the latest update of the enquiry.
Creation time
The time of the latest update of the enquiry.
Rebuild
Indicates if the enquiry on cumulative structure should be rebuilt before the result is displayed.