The purpose of this program is to give an overview of included material on one level for a selected item structure.
Options
Details | Select this option to view detailed information for a material line. |
Next level | Select this option to view the structure of a sub-assembly material line. Note: This option is only valid for items with item type 1 or 2. |
Text | Select this option to view text connected to a material line. |
Function keys
Structure header | View structure header information. |
Alt/co-product | View alternative items/co-products that are defined for the item structure. |
- Item
- Warehouse
- Structure unit
- Variant
- Level
- The currently displayed structure level. The level indicates how many times the Next level option has been used.
- Structure quantity
- Change date
- Seq no
- Component item
- The code that identifies the item which is included as a component in the bill of material.
- Quantity
- The quantity, displayed in up to 3 decimal places, of components included in the bill of material.
- Set-up quantity
- The fixed set-up quantity for materials. This set-up quantity can be deemed as an estimated reservation that you plan on consuming for the machine set-up before real production, and is independent of the order’s quantity. When manufacturing orders are entered, the components required quantity is calculated as follows: order quantity x component quantity + fixed set-up quantity.
Example:
Fixed set-up quantity = 10
Order quantity = 5
Component quantity = 1
Component required quantity = 15
- Unit
- Item type
- The code indicates the item type:
- Phantom
- Indicates if the item should be handled as a phantom item in manufacturing orders. This means that material and operations on the phantom item will be moved from lower levels to level 1.
- Oper
- The operation number indicates where the material is used first during production.
- Text
- Indicates if connected text exists for the material line.
- BOM
- Indicates if the component has been created from a master BOM.