1. Home
  2. /
  3. Panel Help
  4. /
  5. Manufacturing
  6. /
  7. Master BOR enquiry (BAS260B)

Master BOR enquiry (BAS260B)

The purpose of this program is to enquire about master header information for bill of operations.

BOR id
The code that identifies the Master BOR.
Description
The description of the Master BOR.
Structure quantity
The structure quantity. This quantity indicates the relationship between the structure quantity and the component quantities/operation times.

The structure quantity can be used to adjust the operation times in order to avoid short times in the bill of routing.

If the structure quantity is changed, meaning that the component quantity is also changed, then the run, labour and machine time must be adjusted accordingly.

Structure unit
The structure unit of the item. See Structure unit handling for more information.
Allow change times
Indicates if it should be allowed to change the operation times on the real item’s structure.
Allow change cost
Indicates if it should be allowed to change the operation cost (sub contract) on the real item structure.