Manufacturing order maintenance, Bill of routing (PRO002G)

The purpose of this program is to work with operations for a manufacturing order.

Options

Text Select this option to maintain operation texts to be printed on shop floor documents.
Tools Select this option to maintain tools connected to an operation. This option is only allowed to be used if the DC1 Tools and fixtures functionality is activated in Work with companies.
Conf criteria Select this option to define conformity criteria to be connected to the manufacturing operation. Included criteria will be printed on the operation cards as informational text.
Reset status Select this option to back the operation one step. (The order status will not be changed). You will receive a confirmation panel where you confirm the action. Note: This roll back is only allowed when the operation’s line status is 20 (printed) or 40 (started). Also, if the operation line status is at 40, all time fields and quantities (cost control) must be zero.
Reschedule Select this option to reschedule that operation.
Open oper Select this option to open a closed operation. Note: The operation status will be changed from 60 (closed) to 40 (started).

Function keys

Header Maintain the header information.
Backward reschedule Reschedule the order backwards to get a new calculated start date.
Forward reschedule Reschedule the order forwards to get a new calculated completion date.

Selection fields

Item
Warehouse
Status
The code indicates the status of the manufacturing order.

Valid codes are:

Variant
Drawing no
Unit
The stock or structure unit of the item. See Structure unit handling for more information.
Order type
Order number
Plan start
Plan compl
Order quant
Actual start
Actual compl
Oper no
Work centre
Description
Plan start
Planned start time
The time when the operation is planned to be started. This field is only displayed if the MPL-TIME (Plan operation by date/time) function is activated in the Function control file.
Plan compl
Planned compl time
The time when the operation is planned to be completed. This field is only displayed if the MPL-TIME (Plan operation by date/time) function is activated in the Function control file.
Actual start
The first date when an operation reporting was done.
Actual start time
The actual start time of the operation. This field is only displayed if the MPL-TIME (Plan operation by date/time) function is activated in the Function control file.
Actual compl
The date indicates when the operation was reported as completed.
Actual compl time
The actual completion time of the operation. This field is only displayed if the MPL-TIME (Plan operation by date/time) function is activated in the Function control file.
St
The code indicates the status of the operation.

Valid codes are:

Text
Indicates if text is connected to the operation.