1. Home
  2. /
  3. Panel Help
  4. /
  5. Manufacturing
  6. /
  7. Material clearance enquiry (PRO023E)

Material clearance enquiry (PRO023E)

The purpose of this program is to view material clearance either for a selected item or a manufacturing order. The purpose is also to find out when it is possible to deliver a requested item and quantity (if the production starts today). The best date for production and delivery is displayed. The program displays one level, but it is possible to view lower levels by clicking the Next level option. Next level is only possible to use on produced items defined as standard and if they are defined with availability check on BOM or BOR.

Options

Time axis Select this option to view the time axis.
Next level Select this option to view the material/capacity clearance for a sub-assembly item. Note: This option can only be used on produced items defined as standard and if they are defined with availability check on BOM or BOR. This option might also be valid if clearance is made from the selection panel (PRO011D) and if calculation of lower levels is selected. However, this option is not valid if clearance is made for a manufacturing order.

Function keys

Capacity View the capacity clearance.
Time axis View time axis for the produced item.
Prev level Only used if you are viewing lower levels. Return to the previous level.

Selection fields

Item
Warehouse
Variant
Quantity
Start date
This field is only displayed if clearance is made for a manufacturing order.
Compl date
This field is only displayed if clearance is made for a manufacturing order.
Order number

Item
Whs
The reservation warehouse of the component.
Quantity
The quantity that is needed or already reserved if clearance is made for a manufacturing order.
Date
The disposal date.
S