1. Home
  2. /
  3. Panel Help
  4. /
  5. Manufacturing
  6. /
  7. Supply plan net change...

Supply plan net change calculation (REQ037A)

Related topics

From this panel you can calculate supply plan changes for lower level materials. The calculation is based on produced items in an existing supply plan where the supply quantity has been changed on item/warehouse/period level.

Version
Enter the code that identifies the supply plan version.
Job name
The name of the job.
Job queue
The job queue to which the job will be submitted. The default job queue is retrieved from the Change job parameter (2) panel for this particular job. The job queue can be changed if your user profile in the iSeries is defined with job control authority.
Library
The library in which the job queue is stored. The default library is retrieved from the Change job parameter (2) panel for this particular job. The library can be changed if your user profile in the iSeries is defined with job control authority
Priority
The priority which the job will get when placed in the job queue. Valid values range from 1 (highest priority) to 9 (lowest priority). The default priority is retrieved from the Change job parameter (2) panel for this particular job. The priority can be changed if your user profile in the iSeries is defined with job control authority.
Hold
Indicates if the job should be held in the job queue. The default code is retrieved from the Change job parameter (2) panel for this particular job. The code can be changed if your user profile in the iSeries is defined with job control authority.
Time
If you want to run the job at a later time, enter the time when the job should start. The job will be submitted to the job queue now, but it will not start until the time you entered. Note: If you enter a point of time in the past, then the job will start immediately. The time can be changed/entered if your user profile in the iSeries is defined with job control authority.