This panel displays the workload for a specific supply plan version.
Options
Function keys
Items | Work with items. |
Tools | View tool allocations. |
Selection fields
- Work centre
- The work centres for which workload exists.
- Description
- The work centre description.
- Dep sect
- The department section referring to the work centre.
- Overload
- Indicates if overload exists for critical resources in the first forecast period interval. It is regarded as overload when the calculated workload is over the workload acceptance.