Project element line maintenance, Total cost/cost by unit (POM003T)

Related topics

This panel displays the product costing and cost control values from the manufacturing order that is connected to the project element line.

Function keys

Shift infoToggle to change the manner in which information for the records on this panel are listed.
Order number
The project, phase number, line number and phase description.
Description
The description of the different costing values that can be displayed for the element:

  • Total manufacturing cost
  • Component cost
  • Run labour/machine cost
  • Component cost TL (this level)
  • Run labour/machine cost TL (this level)
  • Manufacturing cost LL (lower level)
  • Component cost LL (lower level)
  • Run labour/machine cost LL (lower level)
  • Run labour time TL (this level)
  • Machine time TL (this level)
  • Run labour time LL (lower level)
  • Machine time LL (lower level)
Product costing
The product costing values for the element.
Cost control
The cost control values for the element.
Difference
The difference between the product costing and the cost control values.
Run labour time (override)
In Total cost mode, the run labour time that overrides the calculated values that are displayed in Run labour time TL/LL.
Machine time (override)
In Total cost mode, the machine time that overrides the calculated values that are displayed in Machine time TL/LL.