1. Home
  2. /
  3. Panel Help
  4. /
  5. Project Management
  6. /
  7. Actual follow-up maintenance (POM023C)

Actual follow-up maintenance (POM023C)

Related topics

On this panel you can report performed follow-up actions for a specific handler. Each action will be written in a history file for the project/quotation that can be viewed through the Planned follow-up code enquiry. You can therefore keep track of the planned actions and see when they have been dealt with.

Options

Note: These options are only displayed when in change mode.

Handler
The handler for whom the actual follow-up actions will be maintained. All the follow-up actions which have the selected handler as planned handler are displayed.
Planned date
The planned date is used for positioning on the planned date of the follow-up action. Note: This field is only displayed when in change mode.
Date
The planned and actual dates of the action.
Number
Line
Code
The planned and actual follow-up codes. The codes are defined in the Follow-up codes table.
Description
The description of the planned and actual actions. These descriptions are retrieved from the Follow-up codes table.
Close
Indicates if the line is closed. If this field is set to YES, the line will be closed and the status will be set to 9 (closed).
Status
The code indicates the status of the action.

Valid codes are:

Code Description
Blank Open
9 Closed