Project product costing (POM061A)

Related topics

This selection program is used to start a product costing of the project/quotation material and operation structure. Note: This functionality can only be used if DC1 Manufacturing is installed and activated and only for element lines with manufactured items for which an item structure exists.

Customer
Project no
Status
The code indicates the status of the project/quotation.

Valid codes are:

Phase
Line number
Item
The item for which the product costing is to be started.
Quantity
The quantity from the line.
Print report
Indicates if a report of the result of the project/quotation product costing is going to be printed.
Display prod costing
Indicates if the Product costing enquiry program should start, immediate after the costing, to display the results.