This program gives an overview of the totals of the different elements for the selected phase. This enquiry provides the user with an overview of the total values of the project/quotation and the selected phase.
Total cost price, gross sales and net sales price are displayed for each element of the selected project/quotation phase. The margins between net sales and cost prices and net sales and gross sales are calculated.
The totals are updated at run time when a price of a detail line is changed (e.g., maintenance programs, project product costing). This means that no special calculation function is necessary. The total invoicing plan and time/material value is also displayed.
Options
| Display element | Select this option to view phase element details. |
Function keys
- Status
- The code indicates the status of the project/quotation.
- Project/Quotation
- Currency
-
- Exch rate
- The exchange rate of the project/quotation.
- Description
- The description of the project/quotation.
- Total Proj/Quot
- The total values of the whole project/quotation.
- Phase
- The selected phase number and description.
- Tot. Phase
- The total values of the selected phase.
- Cost price
- The total cost price.
- Margin
- The margin between cost and net sales price.
- N. sal. prc
- The total net sales price.
- Margin
- The margin between net and gross sales price.
- G. sal. prc
- The total gross sales price.
- Time/mat
- The total to be invoiced on time material.
- Inv Plan
- The total to be invoiced on invoice plan.
- Seq
One line per phase element, which belongs to the selected phase, with the total values is displayed.
- T
- The code indicates the element type.
Code Description 1 Line 2 Service 3 Activity
- Cost price
- The total cost price.
- Margin
- The margin between cost and net sales price.
- N. sal. prc
- The total net sales price.
- Margin
- The margin between net and gross sales price.
- G. sal. prc
- The total gross sales price.
- Time/mat
- The total to be invoiced on time material.
- Cc1
- The cost code for the element line.
- Cc2
- The user defined cost code for the element line.