  7. Line enquiry (POM203F)

Line enquiry (POM203F)

Related topics

The purpose of this program is to enquire about item and assembly lines. Enquiries can be made for both purchased and assembled items.

Function keys

Discounts View the calculated item discounts.
Transactions View the reported transactions.
Structure View the item structure.
Customer
Project type
Status
The code indicates the status of the project/quotation.

Valid codes are:

Project no
Phase

Line number
Price code
The code from the Item price code table indicates how the sales price is set.
Item
Warehouse
Quantity
The quantity of ordered units of the item.
Disp date
The dispatch date of the line.
Unit
The sales unit of the quantity.
Description
The description of this line.
Planned cost
The planned cost price for this line.

When you add or change a project element line, the planned cost is replaced with purchase price if all of the following is true:

  • Acquisition type is set to 3, or changed to 3.
  • Cost type is 1 or 3 (Average / FIFO).
  • Price exists for the main supplier (Currency is set from supplier).

If element line is created via link from Work with purchase order, the cost price is set from the purchase price on the purchase order line. Cost price is recalculated according to conversion factor for unit.

Pl cost am
The total cost price for this line.
Actual cost
The actual cost price for this line.
Act cost am
The total actual cost for this line.


Gross sales
The sales price per unit for this line; this price is in project/quotation currency.
Gross sales am
The gross sales value line contains the total line amount (at gross sales price).
Net sales
The net sales price of this line, i.e. the price quoted to the customer/prospect. This price is in project/quotation currency.
Net sales am
The total line amount at net sales price.
Price unit
Only displayed if the PRCUNIT (Price unit handling) function is activated in the Function control file. Displays the unit in which the price is presented. See About price unit handling for more information. This has no effect on the sales price code.

Example: An element line is placed for the item X and sales unit CASE. CASE has conversion factor 12 compared to the stock unit EACH. The sales price for item X and unit CASE has a price unit set to EACH. The sales price is defined as 100 GBP.

The result on the sales order line will be:

Quantity 1
Sales unit CASE
Price 100 GBP
Price unit EACH
Line amount 1200 GBP
Prc unit qty
Only displayed if the PRCUNIT (Price unit handling) function is activated in the Function control file. Displays the quantity for the project line displayed according to the price unit. See About price unit handling for more information.
Calc price
Indicates if the line has to be calculated, i.e. if the project product costing must update the calculated price in the element line.
Print prices
Indicates if the detail prices should be printed.
Hide line
Indicates if this line should be printed.
Time/mtrl
For activity or service lines: Indicates if the element line is possible to deliver or invoice from the project invoicing function.

For item lines: Indicates if the element line is possible to deliver or invoice from the project invoice function. If this field is set to NO, the following possibilities are available:

  • Creation of sales order.
  • Automatically or manually issue to project without any possibility to invoice the element line. (More likely to be invoiced from a project invoice plan.)
Cost code
The cost code for this line.
Acq type

Handler
The handler of the project.
Struct handl
This field is only displayed if DC1 Manufacturing is installed and activated. The code indicates how unique item structures should be handled for the project/quotation when manufacturing orders are created from an element line.

Valid codes are:

Code Description
Blank No item structure will be retrieved.
1 Structure: The item structure will be retrieved from the project.
2 Additional material: The system will retrieve both the item structure from Basic data as well as any additional material that have been defined in the project structure. Note: This structure handling type will also affect the allocation in stock.