Project cost control enquiry (POM210A)

The purpose of this program is to enquire about a project’s cost control. This function can be used to start the Project cost control enquiry. When a project number is entered, the selected overview will be displayed.

Function keys

Cost control history View the cost control history.
Project
Phase
The phase number of the project to be displayed. This is only valid for enquiry type 4, 5 and 6.
Cost code
The cost code of the project to be displayed. This is only valid for enquiry type 3 and 5.
Type enquiry
The code indicates the type of enquiry to be displayed.

Valid codes are:

Code Description
1 Cost control per phase
2 Cost control per cost code
3 Cost control elements per cost code
4 Cost control phase per cost code
5 Cost control elements per phase per cost code
6 Cost control elements per phase