Related topics

The purpose of this program is to enquire about material structures. The structure information is displayed in sequence number order. If an item is to be picked in connection with an operation the operation sequence number is displayed.

Options

Lower level material Select this option to display lower level material. This option is only allowed for items with item type 1, 2 or 8.
Lower level operation Select this option to display lower level operations. This option is only allowed for items with item type 1, 2 or 8.

Function keys

Operations View operations for this level.
Previous level Only used if you are viewing lower level material. Return to the previous material level.

Selection fields

Customer
Project
Status
The code indicates the status of the project/quotation.

Valid codes are:

Phase
Line number
Item
Level
The current level number within the structure.
Seq no
Component item
Var
The component variant. If the incoming component has different variants, i.e. the incoming structure and/or operation list differs from the basic structure this variant will be stated here.
Quantity
The quantity, up to 3 decimal places, of components included in the material structure.
Unit
Displays the stock unit or the structure unit of the item depending on the Reporting unit defined in the MFG control file. See Structure unit handling for more information.
First op no
The operation number where this material is first used. This is used for dividing the material list into different sets of pick lists. If this information is used the item is reserved for production purposes. The starting time of this operation is used instead of the starting time of the production order.
Text
Indicates if a text line is connected to the structure line.