Related topics
On this panel you can view the bill of routing for a project/quotation element line.
Options
Cost prices |
Select this option to view the operation hours prices. |
Conf criteria |
Select this option to view the conformity criteria connected to the project structure operation. |
Function keys
This level material |
View material on this level. |
Minutes/Decimals |
Toggle between hours and minutes and hours and decimals for the operation times. |
Previous level |
Only used if you are viewing lower level operations. Return to the previous operation level. |
- Customer
- Project
- Status
- The code indicates the status of the project/quotation.
Valid codes are:
- Phase
- Line number
- Item
- The code that identifies the item and variant.
- Level
- The current level number within the structure.
- Op no
- Description
- Work centre
- TB-code
- Run and labour time
- The run and labour time in hours for the operation.
- Text
- Indicates if extended operation text exists for the operation.