Related topics
This program is used for clocking in. The same program is used both in Time reporting and in Work with attesting.
- Employee
- Date
- The date for clocking in.
- Time
- The time for clocking in.
- Time code
- Enter a valid time code for the wage group to which the employee belongs. If a time code is mandatory, optional or not allowed depends on the Absence code control and Presence code control system values, and whether you clock in during working hours or outside working hours.
- Continue ongoing
- This text is shown if you had an ongoing activity (not for a group order) that was not stopped when you clocked out. Indicate if you want to continue the activity.
- Continue in group
- This text is shown if you had an ongoing activity for a group order that was not stopped when you clocked out or if you are a member of a work group currently working on an order. Indicate if you want to continue or start the activity. If NO, you will automatically leave the work group.
- Project activity
- These fields are only shown if DC1 Project is installed and activated. Enter the project or quotation number, the phase number and activity number if you want to start a new activity at the same time as clocking in. If values are entered, then they must be the key of an existing activity line in DC1 Manufacturing.
- Project
- Only shown if DC1 Project is not installed. Enter a project code if you want to start a new activity at the same time as clocking in.
- Cost centre
- Enter the cost centre code if you want to start a new activity at the same time as clocking in.