Change a batch

Related topics

The R/F batch can be changed as long as the status of the R/F batch is equal to or less than 10. You can make changes to the priority, the resource group, the resource and the handler.

  1. Select the Work with R/F instructions menu item. Note: If Radio Frequency Handling is not activated in the main warehouse, then you access the Warehouse selection where you select the applicable warehouse to work with.
  2. You access Work with R/F instructions, Open batches. Select the batch you want to change and click Change.
  3. You access Work with R/F instructions, Control information. You can change the following fields:
  4. Priority
    Enter a priority value indicating in which order the R/F batches should appear in the Select R/F batch function. Valid values range from 1 through 99999, where 1 is the highest priority.
    Resource group
    Enter a code from Work with resource groups indicating the resource group to which the batch should be assigned. Note: If both this field and the Resource field are completed, then the entered resource must be assigned to the resource group specified in this field.
    Note: See Resource groups for more information.
    Resource
    Complete this field, if it is certain what resource should be used during the completion of this R/F batch. The resource must exist in the Resource allocation table. If the field is left blank, the resource allocated to the handler selecting this R/F batch, will be used during completion of the R/F batch.
    If a handler has selected an unassigned R/F batch, and completed any instructions, this field will be updated with the resource that was used. To change an existing batch the status must be equal to or less than 10.
    Note: See Resource locations for more information.
    Handler
    This field is mandatory if the Resource field was completed. Enter the handler that should complete this R/F batch. The handler must be allowed to use the resource entered in the Resource field and must exist in Work with signatures.
    If the Resource field was left blank and this field is completed, then only this handler can select this R/F batch. The resource being used will depend on the resource allocated to the handler during R/F batch selection.
    If this field is left blank, then all handlers will have the possibility to select this R/F batch. If a handler has selected an unassigned R/F batch, and completed any instructions, then the name of the handler will be updated in this field.

    Click OK. Exit the routine.

Related topics